Minimum quantity for "Clarifying the Extent of Northridge-Induced Weld Fracturing; Examining the Related Issue of UT Reliability" is 1.
Minimum quantity for "SAC Training Presentations" is 1.
Minimum quantity for "Cyclic Testing of a Free Flange Moment Connection" is 1.
Minimum quantity for "Experimental Investigations of Materials, Weldments and Nondestructive Examination Techniques" is 1.
Minimum quantity for "FEMA P-695, Quantification of Building Seismic Performance Factors" is 1.
Minimum quantity for "Evaluating the Seismic Resistance of Existing Buildings" is 1.
Minimum quantity for "SAC Phase 2 Test Plan" is 1.
Minimum quantity for "Failure of a Column K-Area Fracture" is 1.
Minimum quantity for "Selecting and Scaling Earthquake Ground Motions for Performing Response-History Analyses" is 1.
Minimum quantity for "Cyclic Response of RBS Moment Connections: Weak-Axis Configuration and Deep Column Effects" is 1.
Minimum quantity for "Reliability-Based Seismic Performance Evaluation of Steel Frame Buildings Using Nonlinear Static Analysis Methods" is 1.
Minimum quantity for "Integrative Analytical Investigations on the Fracture Behavior of Welded Moment Resisting Connections" is 1.