Earthquake and Tsunami

$10.00
Structural, Technical Brief, Earthquake and Tsunami, Building Design, Pre-Disaster
The NEHRP Seismic Design Technical Brief No. 8: Seismic Design of Steel Special Concentrically Braced Frame Systems, A Guide for Practicing Engineers was...
In stock
+

Minimum quantity for "NEHRP Seismic Design Technical Brief No. 8: Seismic Design of Steel Special Concentrically Braced Frame Systems: A Guide for Practicing Engineers" is 1.


$25.00
Building Design, Structural - General, Structural, Pre-Disaster, Earthquake and Tsunami
**FREE FOR DOWNLOAD**  An electronic copy of this report is available from the  FEMA library . The ATC-63-1 (FEMA P-795) report, Quantification...
In stock
+

Minimum quantity for "FEMA P-795, Quantification of Building Seismic Performance Factors: Component Equivalency Methodology" is 1.


$25.00
Task Order 13-497 (ATC-114 Project) , Analysis, Modeling, and Simulation for Performance-Based Seismic Engineering . This report presents...
In stock
+

$25.00
Structural - General, Earthquake and Tsunami, Building Design, Pre-Disaster
The Evaluation of the FEMA P-695 Methodology for Quantification of Building Seismic Performance Factors report was produced under contract to the National...
In stock
+

Minimum quantity for "Evaluation of the FEMA P-695 Methodology for Quantification of Building Seismic Performance Factors" is 1.


$10.00
Retrofit, Pre-Disaster, Bridge Design and Retrofit, Earthquake and Tsunami
The ATC-66 CD (FEMA P-774 CD) Report, Unreinforced Masonry Buildings and Earthquakes, Developing Successful Risk Reduction Programs, provides guidance on...
In stock
+

Minimum quantity for "FEMA P-774, Unreinforced Masonry Buildings and Earthquakes, Developing Successful Risk Reduction Programs" is 1.


$10.00
Structural, Technical Brief, Earthquake and Tsunami, Building Design, Pre-Disaster
The NEHRP Seismic Design Technical Brief No. 7: Seismic Design of Reinforced Concrete Mat Foundations: A Guide for Practicing Engineers , was produced...
In stock
+

Minimum quantity for "NEHRP-TB7, Seismic Design of Reinforced Concrete Mat Foundations: A Guide for Practicing Engineers" is 1.


$25.00
Earthquake and Tsunami, Building Design, Structural - General, Structural, Pre-Disaster
**FREE FOR DOWNLOAD**  An electronic copy of this report is available from the  FEMA library . The ATC-58a (FEMA 445) report, Next-Generation...
In stock
+

Minimum quantity for "Next-Generation Performance-Based Seismic Design Guidelines" is 1.


$10.00
Structural, Research Reports, Earthquake and Tsunami, Building Design, Pre-Disaster
The report, Natural Hazard Mitigation Saves: An Independent Study to Assess Future Savings from Mitigation Activities, Volume 1: Findings, Conclusions, and...
In stock
+

Minimum quantity for "Natural Hazard Mitigation Saves: An Independent Study to Assess Future Savings from Mitigation Activities, Volume 1: Findings, Conclusions, and Recommendations" is 1.


$25.00
Structural, Research Reports, Earthquake and Tsunami, Building Design, Pre-Disaster
The Program Plan for the Development of Collapse Assessment and Mitigation Strategies for Existing Reinforced Concrete Buildings was produced under...
In stock
+

Minimum quantity for "Program Plan for the Development of Collapse Assessment and Mitigation Strategies for Existing Reinforced Concrete Buildings" is 1.


$25.00
**FREE FOR DOWNLOAD**  An electronic copy of this report is available from the  FEMA library . This guidance evaluates current building...
In stock
+

$25.00
Structural, Research Reports, Earthquake and Tsunami, Building Design, Pre-Disaster
The report, Natural Hazard Mitigation Saves: An Independent Study to Assess Future Savings from Mitigation Activities, Volume 2: Study Documentation , was...
In stock
+

Minimum quantity for "Natural Hazard Mitigation Saves: An Independent Study to Assess Future Savings from Mitigation Activities, Volume 2: Study Documentation" is 1.


$25.00
Task Order 13-497 (ATC-114 Project) , Analysis, Modeling, and Simulation for Performance-Based Seismic Engineering . The guidance included in this...
In stock
+