Minimum quantity for "Integrative Analytical Investigations on the Fracture Behavior of Welded Moment Resisting Connections" is 1.
Minimum quantity for "SAC Phase 2 Test Plan" is 1.
Minimum quantity for "Experimental Investigations of Materials, Weldments and Nondestructive Examination Techniques" is 1.
Minimum quantity for "Reliability-Based Seismic Performance Evaluation of Steel Frame Buildings Using Nonlinear Static Analysis Methods" is 1.
Minimum quantity for "Database on the Performance of Structures near Strong-Motion Recordings: 1994 Northridge Earthquake" is 1.
Minimum quantity for "SAC Training Presentations" is 1.
Minimum quantity for "Clarifying the Extent of Northridge-Induced Weld Fracturing; Examining the Related Issue of UT Reliability" is 1.
Minimum quantity for "Characterization of the Material Properties of Rolled Sections" is 1.
Minimum quantity for "FEMA 267B, Interim Guidelines Advisory No. 2 Supplement to FEMA-267 Interim Guidelines" is 1.
Minimum quantity for "Failure of a Column K-Area Fracture" is 1.
Minimum quantity for "Cyclic Testing of a Free Flange Moment Connection" is 1.
Minimum quantity for "Cyclic Response of RBS Moment Connections: Weak-Axis Configuration and Deep Column Effects" is 1.