Minimum quantity for "FEMA 355E, State of the Art Report on Past Performance of Steel Moment-Frame Buildings in Earthquakes" is 1.
Minimum quantity for "Protocol for Fabrication, Inspection, Testing and Documentation of Beam-Column Connection Tests and Other Experimental Specimens" is 1.
The report documents a study to evaluate whether using reinforcement with yield strength greater than 60 ksi in structural members that resist earthquake forces is appropriate in the United States
Minimum quantity for "Use of High-Strength Reinforcement in Earthquake-Resistant Concrete Structures" is 1.
Minimum quantity for "Weld Acceptance Criteria for Seismically-Loaded Welded Connections" is 1.
Minimum quantity for "Through-Thickness Strength and Ductility of Column Flanges in Moment Connections" is 1.
Minimum quantity for "FEMA 288, Background Reports: Metallurgy, Fracture Mechanics, Welding, Moment Connections and Frame Systems Behavior" is 1.
Minimum quantity for "Behavior and Design of Radius Cut Reduced Beam Section Connections" is 1.
Minimum quantity for "Surveys and Assessment of Damage to Buildings Affected by the Northridge Earthquake of January 17, 1994" is 1.
Minimum quantity for "Assessment of the NIST 12-Million-Pound (53 MN) Large-Scale Testing Facility" is 1.
Minimum quantity for "Assessment of the Benefits of Implementing the New Seismic Design Criteria and Inspection Procedures" is 1.
Minimum quantity for "Case Studies of Steel Moment Frame Building Performance in the Northridge Earthquake of January 17, 1994" is 1.
Minimum quantity for "FEMA P-58-2, Seismic Performance Assessment of Buildings, Volume 2 - Implementation Guide" is 1.