Minimum quantity for "A Critical Review of Current Approaches to Earthquake Resistant Design" is 1.
Minimum quantity for "A Framework to Update the Plan to Coordinate NEHRP Post-Earthquake Investigations" is 1.
Minimum quantity for "A Methodology for Seismic Design and Construction of Single-Family Dwellings" is 1.
Minimum quantity for "An Evaluation of a Response Spectrum Approach to Seismic Design of Buildings" is 1.
Minimum quantity for "An Evaluation of the Imperial County Services Building Earthquake Response and Associated Damage" is 1.
Minimum quantity for "Analytical and Field Investigations of Buildings Affected by the Northridge Earthquake of January 17, 1994" is 1.
Minimum quantity for "Appendix to: Parametric Study on the Effect of Ground Motion Intensity and Dynamic Characteristics on Seismic Demands in Steel Moment Resisting Frames" is 1.
Minimum quantity for "Applicability of Nonlinear Multiple-Degree-of-Freedom Modeling for Design" is 1.
Minimum quantity for "Assessment of the Benefits of Implementing the New Seismic Design Criteria and Inspection Procedures" is 1.
Minimum quantity for "Assessment of the NIST 12-Million-Pound (53 MN) Large-Scale Testing Facility" is 1.
Minimum quantity for "Assessment of the Reliability of Available NDE Methods for Welded Joints and the Development of UT Procedures" is 1.
The ATC-20-1 Bhutan Field Manual: Postearthquake Safety Evaluation of Buildings, represents adaptations to the U.S. version of the ATC-20-1 Field Manual to account for Bhutan’s vernacular buildings, as well as Bhutan’s cultural and governmental context. During the development, a number of improvements were made to the presentation of material in the ATC-20-1 Field Manual, including a graphical format with numerous images to help engineers evaluate damaged buildings more accurately. Also, the procedures incorporate recent lessons learned during postearthquake safety evaluations following the Chile (2010) and New Zealand (2010-2011) earthquakes. (Published 2014, 246 pages)
Printed on international size A5 paper and providing full color illustration of numerous damage types, this report is printed in limited quantities. Large orders may be printed on demand within 5 business days of the order.
Minimum quantity for "ATC-20-1 Bhutan Field Manual: Postearthquake Safety Evaluation of Buildings" is 1.